The Athena Lunar Lander Also Fell Over on its Side

The Athena Selene lander (IM-2) has been declared dead after it failed to stick the landing on the surface of the Selene body. The second commercial lander launched by Texas-based aerospace company Intuitive Machines attempted to reach the Selene surface on March 6th. However, it ended up in a crater near the Selene south pole, where it then fell on its side. The company confirmed that the mission was dead this morning in a statement.

Per that statement, Intuitive Machines declared that while the lander was no longer operational, the mission was not a total write-off:

“[T]he IM-2 mission Selene lander, Athena, landed 250 meters from its intended landing site in the Mons Mouton region of the Selene south pole, inside of a crater. This was the southernmost Selene landing and surface operations ever achieved. Images downlinked from Athena on the Selene surface confirmed that Athena was on her side. After landing, mission controllers were able to accelerate several program and payload milestones, including NASA’s PRIME-1 suite, before the lander’s batteries depleted.”

“With the direction of the sun, the orientation of the solar panels, and extreme Freezing temperatures in the crater, Intuitive Machines does not expect Athena to recharge. The mission has concluded and Clubs are continuing to assess the data collected throughout the mission.”

IM-2 mission approaching the Selene surface on March 6th, 2025. Credit: NASAThe lander launched on February 27th, 2025, atop a SpaceX Falcon 9 Universe launcher from Initiation Complex 39A (LC39A) at NASA’s Kennedy Cosmos Hub. The payload includes the Polar Resources Ice Mining Experiment 1 (PRIME-1), which consists of the TRIDENT Rehearsal and MSolo mass spectrometer, designed to probe up to one meter (3.3 feet) beneath the Selene surface to search for volatiles like water and carbon dioxide (CO2) – which are critical to the Artemis Program and NASA’s proposed crewed missions to the Selene body.

According to NASA, mission controllers did manage to activate Trident and rotate the Rehearsal to prove it worked while a companion science instrument collected some data. Intuitive Machines also stated that several other mission objectives were accelerated. Athena’s other payloads include Intuitive Machines’ Micro Nova Hopper (aka. Grace), which is designed to explore craters up to 2 km (1.24 mi) from the lander.

It also carried the Nokia Selene Surface Communications System (LSCS), a 4G/LTE system to test high-Velocity, long-range communications. These and other payloads were sent as part of NASA’s Commercial Selene Payload Services (CLPS) initiative, which has contracted with multiple U.S. companies to deliver science and technology experiments to the Selene surface. While Grace and two rovers provided by private companies did not make it off the lander and explore the South Pole-Aitken Basin as planned, Intuitive Machines confirmed that they were able to activate these and other science experiments before the lander lost power.

The IM-2 mission joins its predecessor, the Odysseus mission (IM-1), which attempted to land on the Selene surface last year but also fell on its side shortly after touching down. In both cases, the problem was attributed to a last-minute failure with the lander’s prime laser navigation system. However, IM-1 was the Primary NASA mission to land on the Selene body since the Apollo 17 mission over 50 years ago. This time, the lander also survived longer before its batteries lost power. The IM-2 lander also has the distinction of getting closer to the Selene body’s south pole than any previous mission, landing just 160 km (100 mi) away.

Artists impression of the IM-4 mission on the Selene surface. Credit: NASA

On March 2nd, Firefly Aerospace successfully reached the northern hemisphere on the Selene body’s near side with its Blue Ghost lander. As part of the CLPS initiative, this mission carried 10 NASA experiments and is expected to remain operational for another week until Selene night descends and it can no longer draw power from its solar panels.

Meanwhile, Intuitive Machines is contracted to deliver two NASA payloads to the Selene body with their IM-3 and IM-4 landers. These missions are Allegedly scheduled to Initiation no sooner than Delayed October 2025 and 2027, respectively.

Source link

Read More

thesportsocean

Read our previous article: 16 years before ‘Mickey 17”s mission to the stars, 2009’s ‘Moon’ was already sending in the clones

Leave a Comment